Beam Service Person-2nd shift
|
Fabric Formation
|
POSITION SUMMARY: This position is responsible for servicing the Knitting machine with warps and shafting beam sets by following all safety procedures.
|
Full-Time
|
4PM-12AM
|
04/30/2024
|
Apply
|
Beam Service-3rd shift
|
Fabric Formation
|
POSITION SUMMARY: This position is responsible for servicing the Knitting machine with warps and shafting beam sets by following all safety procedures.
|
Full-Time
|
12AM-8AM
|
05/31/2024
|
Apply
|
Creeler-3rd shift
|
Fabric Formation
|
POSITION SUMMARY: This position is responsible for loading the yarn into the creels, stripping the empty cones and tying new packages in. Also responsible for checking the creel load paperwork against the warping creel load paperwork making sure all the yarn is correct. Calculating the creel waste and recording. Repacking any yarn that needs to go back in inventory and recording.
|
Full-Time
|
12AM-8AM
|
04/30/2024
|
Apply
|
Dye Operator - 2nd shift
|
Dyeing
|
POSITION SUMMARY:
This position will include operation of the jet dye machine and operation of the extractor.
|
Full-Time
|
4PM-12AM
|
05/31/2024
|
Apply
|
Dye Operator - 3rd shift
|
Dyeing
|
POSITION SUMMARY:
This position will include operation of the jet dye machine and operation of the extractor.
|
Full-Time
|
12AM-8AM
|
05/31/2024
|
Apply
|